Urban Park Construction
Work consists of construction of a public park (the Urban Park), including landscaping, irrigation, a fog misting system, walking path,…
Willows Intermediate School Modernization
The scope of this project was to install electrical, Fire Alarm and Low Voltage per Plans and Specifications.
Shasta College Handball/Dorm Conversion
Work consists of conversion of an existing building into non-student dormitories, including interior finishes, electrical, fire alarm, lighting and HVAC…
Cottonwood Creek Charter School
The scope of this project included the construction of a pre-engineered metal building for a multi-purpose assembly space. This project…
Churn Creek & Maraglia Improvement
Work consists of completion of bike and pedestrian improvements on Churn Creek Road between Hartnell Avenue and East Cypress Avenue…
Meadow Lane Elementary School
This project includes the construction of a multi-purpose gymnasium building and administrative facility. The scope of work includes the demolition…
West Street 9 Classroom, Gym/Cafe, Kindergarten
Work consists of construction of a gymnasium / cafe, kindergarten classroom with a playground and a nine-classroom wing on existing…
Tehama County Department of Education Classroom Building and Server Facility
Construction of New Classroom Building & Server Facility for the Tehama County Department of Education, Red Bluff, Tehama County, California
Shasta Dam Barrier Replacement
Provide and Install Electrical for (4) New Crash Barriers to replace existing Wedge Style Barriers.
Antelope Creek Fish Passage Improvement Project
Construction of a new 100-cfs off-channel fish screen in an existing irrigation diversion from Antelope Creek including fabricated steel support…
City of Redding – Downtown Streets Circulation Project
This project reestablishes pedestrian and bicycle friendly streets along portions of Market Street, Yuba Street, and Butte Street. The work…
Manzanita Elementary School Modernization
Modernization of existing multi-use, classroom and library buildings including window replacement, finish replacement and toilet room upgrades; replacement of existing…
Turtle Bay Elementary School Modernization
Modernization of select portions of campus to address accessibility deficiencies and necessary upgrades to electrical, fire alarm, mechanical & plumbing…
Shasta Regional Medical Center T/I Project
Shasta Regional Medical Center new office space tenant improvements.
Foothill High School Agricultural Building & Site Improvements
New agricultural building and site improvements.
Wash Rack LED Lighting Project
Installation of electrical for new LED lighting.
City of Redding Information Technology Electrical Modification Project
The project includes but not limited to; modifying the electrical at City Hall for Information Technology’s future equipment, provide new…
Sav Mor Foods
Newly completed 32,351 sq. ft. grocery store in Corning, Ca.
Red Bluff High School Science Building and Cafeteria Project
Construction of a new science classroom building to replace existing science classrooms, a new cafeteria building, and miscellaneous site work.
County of Humboldt Juvenile Hall Replacement Facility
The new Juvenile Hall will be constructed primarily of CMU (concrete masonry unit) and will be approximately 19,000 square feet.…
Trinity County Sheriff’s Detention Facility
The project consists of the design and construction of a new stand-alone jail facility on approximately 4.5 acres of county-owned…
R.E.U. Oregon Street Substation
Redding Electric Utility Oregon Street 115/12kV substation modernization project.
Tehama County Health Services Agency
Remodel of the existing Tehama County Hospital Unit, located at 1850 Walnut Street, Red Bluff, California 96080.
R.E.U. SCR Catalyst
Installation of Dual-Function SCR/CO Oxidation Catalyst for Generating Units 5 and 6 at The Redding Power Plant
R.E.U. Waldon Street Substation
Redding Electric Utility Waldon Street substation modernization project.
PG&E Pit #3 Powerhouse
PG&E Pit #3 Powerhouse consolidation and modernization.
PG&E Pit #1
PG&E Pit #1 weir and gate replacement Fall River pond.
SAF Aluminum Anodizing Plant: SAF West
Batch anodizing involves racking parts and immersing them in a series of treatment tanks. Featuring the latest environmentally sound processes,…
Rio Alto Water District-WWTP Constructed Wetlands Project
Installation of a secondary clarifier, return activated sludge pump station, sludge drying beds, constructed wetlands, IO-inch force main, pumps, pipes,…
Siskiyou County Transit Center
Regional Siskiyou County Transit Facility with offices for Siskiyou County General Services and a public meeting /conference room. The facility…
North Area Building Project for Western Area Power Authority
Installation of underground and interior electrical service, installation and modification of fire alarm devices, and installation of complete mechanical systems.
McDonald’s
Provide and Install all underground and interior electrical for new McDonald's.
Shasta County Juvenile Rehabilitation Facility
The new Shasta County Juvenile Rehabilitation Facility replaced the existing Juvenile Justice Center with a new 90-bed Rehabilitation Facility, and…
Columbia Elementary School District Classroom Addition
The Columbia Elementary project added two new classroom buildings, adjacent student break out rooms and student and staff accessible restrooms…
Humboldt County Office of Education Sequoia Conference Center
The new Conference Facility has a capacity of 350 persons and serves as a training and meeting space for HCOE…
Yreka High School Gymnasium
The new gymnasium was designed to accommodate basketball and volleyball tournaments in the northern region, and includes three NFHS regulation…
Trinity Valley Elementary School Classroom Alternations and New Gymnasium
State-of-the-art, modern gymnasium with improved acoustics, new lighting, a new subfloor with maple hardwood flooring, new, durable striping and artwork,…
Orleans Elementary School Gymnasium
State-of-the-art, modern gymnasium with improved acoustics, new lighting, a new subfloor with maple hardwood flooring, new, durable striping and artwork,…
Shasta High School Gen 7 STEM Buildings and Site Improvements
Partial demolition of site elements to accommodate new Gen-7 Modular structures constructed by American Modular Systems. Provide and install Electrical,…
Red Bluff High School Modernization Project
New classroom buildings and gym modernization project at Red Bluff High School. Construction is to begin in Spring of 2019,…
Dignity Health Care Emergency Department Expansion
Expansion of the emergency department at Mercy Medical Center Mt. Shasta located at 914 Pine Street, Mt. Shasta, CA. The…
Enterprise High School Gen 7 STEM Buildings and Site Improvements
Partial demolition of site elements to accommodate new Gen-7 Modular structures constructed by American Modular Systems. Provide and install Electrical,…
Shasta College Electrical Infrastructure
Shasta College Campus Infrastructure Electrical