Stillwater WWTP and Sludge Lagoon Project

Project Info

Location:
Redding, CA


Project Description

Work consists of modification to the digested solids pump station; construction of two facultative sludge lagoons with LLDPE liner systems, floating aerators, dredge equipment and flow splitting facility; construction of two concrete-walled, asphalt-lined sludge drying beds with underdrain system; installation of an +/- 20′ deep wet-well and package vacuum primed pump station; associated yard piping and drainage system improvements; associated site work including grading, fencing and road improvements and associated electrical and instrumentation improvements.