Project Info
Location:
Eureka, CA
Project Description
The new Juvenile Hall will be constructed primarily of CMU (concrete masonry unit) and will be approximately 19,000 square feet. It will have thirty (30) beds with six (6) single-bed youth sleeping rooms and twelve (12) double-bed youth sleeping rooms.
This project included demolition for electrical; Utility transformer pad and placement per PG&E utility requirements; Furnishing and installing diesel generator, ATS, and control wiring; Furnishing and installing all electrical components; Furnishing and installing all conduits and cables where required in underground trenches, which will be excavated and backfilled by others; Furnishing and installing all data conduit and cabling; Furnishing and installing all fire alarm conduit, wiring, and devices for a complete system installation; Furnishing and installing all access control conduit and chases; Furnishing and installing all security alarm conduit and chases; and Updating as-built drawings.